CCPP Power Plant Installation & Infrastructure (480 MW)
MARMARA EREGLI / TEKIRDAG
- Project Date : 1998
- Project Owner : ENTES INDUSTRY FACILITIES, MANUFACTURING AND INSTALLATION, CONTRACTING JOINT INC. CO.
- Cost of Project : 21.900.000 USD DETAILS
ABOUT THE PROJECT
All preliminary building work, including iron, steel, infrastructure, and basic alterations to the facility's fuel oil tanks, has been finished.