LOAD-ING 0
Üçgen Proje

CCPP Power Plant Installation & Infrastructure (480 MW)

MARMARA EREGLI / TEKIRDAG

  • Project Date : 1998
  • Project Owner : ENTES INDUSTRY FACILITIES, MANUFACTURING AND INSTALLATION, CONTRACTING JOINT INC. CO.
  • Cost of Project : 21.900.000 USD
  • DETAILS
ABOUT THE PROJECT

All preliminary building work, including iron, steel, infrastructure, and basic alterations to the facility's fuel oil tanks, has been finished.